Power Church
Power Church · Building Committee
UA Theater Acquisition · Pro Forma Package

8275 W Amarillo Blvd
Acquisition Package

Live financial models, deal documents, and research backing the proposed acquisition of the former United Artists movie theater for Power Church's new home. Click any card below to open.

★ Start Here

Interactive Modeler

Three financing scenarios, all sliders update math in real time. Committee Plan ($3.04M ANB conventional), Strategic Counter ($2M to Cinergy + $2M construction), and Master Lease + Buyout fallback. 12-month cash flow roll-forward at the bottom.

Decision Documents

For the committee
PDF

Committee Packet

Full committee decision document — three scenarios, recommendation framework, open questions, voting guidance.

For ANB · Conventional
PDF

Loan Packet · Conventional

$3.04M ANB acquisition mortgage — 13 sections, demographics, comp sales, DSCR, underwriter Q&A. DSCR 1.16x at tithes only.

For ANB · Seller-Carry Alternative
PDF

Loan Packet · Seller-Carry

Parallel proposal: Cinergy carries the $3.04M acquisition note; ANB funds only the ~$2M renovation construction loan. Permanent ~$5.04M after refi.

For Cinergy
PDF

Seller Pitch

Letter to Deeter Prater (Llano Realty) and the seller (Cinergy 110 LLC). $1.5M-$2M concession ask, two structural alternatives, 30-minute meeting request.

Foundation analysis
PDF

Pro Forma Detail

Complete pro forma analysis with sensitivity tables, scenario reconciliation, and math verification.

Research & Methodology

After-Repair Value

ARV Research

301 lines · 3-approach valuation (cost / income / comps) · Recommended ARV $9.1M mid-case

Bank Packet

Bank Research

552 lines · TxDOT traffic · 2024 ACS demographics · Comp sales · Mortgage rates · Zoning verified

Master Lease

Lease Comp Research

Cinergy intel · Theater→church comps (Littleton CO Apr 2026) · Free-rent norms · Recommended ask

Community Impact

Power Church Track Record

9 years of sourced community work · Barrio Bash · APD partnership · Food pantry · DV Faith Summit · Healing Prayer Walk · ABCD 501(c)(3)

★ Grant Pipeline

Grants — ASAP Pipeline

18 viable grants · $400K–$1.6M addressable · Top 3 with deadlines this month: AAF Catalyst (May 15), Bivins (May 18), Walmart Spark Good. Routing strategy + 20-doc application checklist.

Building Plans

Blueprint Hunt

How to get the actual 1998 architectural drawings · City of Amarillo TPIA path · Seller-deliverables PSA clause · TDLR ADA filings · Industry estimates for footprint, HVAC, ceiling heights, roof age

The Deal in One Page

The Property

  • · 8275 W Amarillo Blvd, Amarillo TX
  • · 83,422 sqft on 10.61 acres
  • · Built 1998, vacant 32 months
  • · Owner: Cinergy 110 LLC (Cinergy Entertainment Group, Dallas)
  • · Listed at $5.5M ($66/sqft) · Negotiated to $3.8M
  • · 2015 prior sale: $12.5M

The Financing

  • · $3.8M purchase, 20% down ($760K from Power Church Building Fund)
  • · $3.04M ANB conventional mortgage @ 7% / 25-yr
  • · Year-1 facility cost: ~$54K/mo (during transition)
  • · Steady-state: ~$44K/mo (after SE 10th sells)
  • · DSCR at conservative income: 2.08x
  • · DSCR on tithes alone (stress floor): 1.16x

The Borrower

  • · Power Church (Texas 501(c)(3))
  • · Pastor Manny De Los Santos
  • · $100K/mo gross giving · $25K/mo deployable surplus
  • · Existing facility: 1344 SE 10th Avenue
  • · Existing real estate appraised at ~$1.9M
  • · Multi-year operational history

Why This Deal

  • · 70% below 2015 peak value
  • · Move-in-ready building (no construction risk)
  • · Parking: 629 spaces (25.8% over Amarillo Code minimum)
  • · ARV at research mid-case: $9.1M
  • · Loan-to-value: 33% (over-collateralized 3:1)
  • · Demographics: ZIP 79124 median HH $101K-$112K
Power Church · UA Theater Pro Forma · Updated
Power Church Building Committee · Pastor Manny De Los Santos, Senior Pastor
Verified data: 2024 Census ACS · TxDOT public records · Amarillo Code §4-10 · LoopNet/Crexi/Realmo · Potter County CAD